Founded in 2002, Midland Contracting started as a general laydown and excavation company with a small fleet of equipment and personnel.  Over the years, Midland Contracting has grown into performing larger scale jobs that include, interstate reconstruction, large scale grading, pipe work, site preparation, gravel lay down and large scale material hauling.  Midland’s equipment fleet is up to date with industry leading technology to accommodate and execute any size project.  Midland Contracting strives for excellence while having qualified trained personnel and leadership for its customers.

2021

Northwestern Energy(Fagen) – Sitework for a new Power Generation Plant in Huron, SD
I-29 Roberts County – Reconstruction of 12 miles of Interstate I-29 near Sisseton, SD
Work Consisted of Removal and Replacement of PCC Pavement, Crushing Concrete Pavement, Select Subgrade Topping, Gravel Cushion and Base Course Placement
SD Hwy 50 – Reconstruction of a 3-mile stretch Highway 50 thru Vermillion, SD
Work consisted of PCC Pavement Removal, Curb and Gutter Removal, Cold Milling, Grading, Undercutting, Base Course placement & Topsoil removal and replacement
City of Vermillion – Storm Sewer improvements thru the City of Vermillion along Hwy 50
South Dakota State Fair – Reconstruction on Midway Avenue on the South Dakota State Fairgrounds
Huron High School– Sitework for a new CTE Building for the Huron School District
3rd Street Huron, SD – 5 City blocks of street reconstruction in Huron, SD
SD Hwy 38 Bridge Replacement- Grading, Pipe installation and Base Course placement for a Bridge replacement project on SD Hwy 38 near Salem, SD
Miller Municipal Airport- Reconstruction of the Hangar Taxilanes in Miller, SD
Eagle- Wheatgrass Village II – Sitework for a new Apartment Complex in Huron, SD

2020

Faulk County Hwy 11 – Pipe replacement, Minor Grading and Gravel Resurfacing of 11 miles of County Hwy 11 near Faulkton, SD
3rd Street – Reconstruction of 3rd Street in Southwest Huron, SD
Hwy 14 & 37 – Removal of segments of Concrete Pavement, Subgrade preparation and Base Course Replacement near Huron, SD
Iverson Ford – Sitework for a new Auto Dealership in Huron, SD
I-29 Roberts County – Reconstruction of 12 miles of Interstate I-29 near Sisseton, SD
I-90 Davidson County – Removal and Replacement of PCC Pavement, Crush Concrete Pavement, Process Subgrade, Culvert Replacement and Base Course Placement for 1 mile of I-90 near Mitchell, SD
Southtown Residential Development – Construction of a new Subdivision in Huron, SD
Agtergra Kennebec – Sitework for new Grain Bin and Grain Tunnel in Kennebec, SD
Agtergra Willow Lake – Sitework for a new Grain Bunker Site in Willow Lake, SD
Hwy 262 Grade Raise– Grade Raise, Pipework, Riprap, and Surfacing of a Section of Hwy 262 that was under Water near Alexandria, SD
Northwestern Energy – Sitework for a new Power Generation Plant in Huron, SD

2019

Madison Airport – Construction of the Parallel Taxiway and Connectors at the Madison Municipal Airport in Madison, SD
Hwy 37/14 – Urban Reconstruction of Hwy 37 & US Hwy in Huron, SD
Hwy 37 Turnlanes – Construction of four Turnlanes on SD Hwy 37 just South of Mitchell, SD
De Smet Airport – Taxilane and Hardstand Construction at the De Smet Airport in De Smet, SD
S Hwy 212-Asphalt Milling, Grading, Box Culvert installation & placing Base Course on the Shoulders East of Watertown, SD
3rd Street – Reconstruction of a city street in Southwest Huron, SD
Agtegra – Sitework for  bin storage upgrades at the Grain Handling Site near Wolsey, SD
Iverson Ford – Sitework for a new Auto Dealership in Huron, SD

2018

Huron Airport – Reconstruction of Taxiway A and Taxiway 12/30.
Redfield Airport – 17/35 Runway Construction in Redfield, SD.
Hwy 37 Reconstruction – Grading and Base Course work for SD Hwy 37 North of Mitchell, SD
Cotton King Avenue – Reconstruction of a portion of Cotton King Av. on the SD State Fairgrounds
James Valley School – Sitework for school addition in Huron, SD
RCP&E Rail Siding – Construction of a 2 mile railroad siding near Phillip, SD
Hwy 50 Turnlane – Construction of a Turnlane on SD Hwy 50 just West of Yankton, SD
Dakota Mill & Grain Rail Siding – Construction of a 2 mile Railroad Siding near Presho, SD
Hoven Airport – Reconstruction of the Apron at the Hoven Airport in Hoven, SD
De Smet Airport – Taxilane and Hardstand Construction at the De Smet Airport in De Smet, SD
Madison Airport – Construction of the Parallel Taxiway and Connectors at the Madison Municipal Airport in Madison, SD
GHDC Spec Building – Sitework for a new Spec Building for Greater Huron Development Corp.
Agtegra – Sitework upgrades at the Grain Handling Sites at Northville, Ipswich, and Redfield, SD
Poet Biorefining – Construction of a Truck Storage Road at the Poet Site near Loomis, SD
SDGF&P – Parking Lot Construction at the Lake Thompson Recreation Area – Parking Lot Construction at the Lake Thompson Recreation Area

2017

Watertown Airport-Reconstruction of Runway 12/30 at the Watertown Airport
Prairie Hills Subdivision-Sitework/Grading Contractor for a large Subdivision in Brookings, SD
Hwy 50 –Urban/Rural reconstruction of 8 mile stretch of Hwy 50 East of Yankton, SD
I-29 Ramp Detours-Constructed 8 Ramp Detours for upcoming Interstate work
Brookings Airport– Reconstruction of Runway 17/35 in Brookings, SD
Dakota Provisions Expansion-Sitework/Grading for Dakota Provisions West Plant in Huron, SD
Huron High School Sports Improvement– Construction of Parking Lots for HHS in Huron, SD
24th ST & Southtown Development– Street Construction for new Development in Huron, SD
Napa Junction Rail Park Roadway-Surfacing for a 3 Mile stretch of Roadway in Yankton, SD
Vermillion Airport– Apron reconstruction at Harold Davidson Field in Vermillion, SD
Lake Cochrane Substation– Sitework for new East River Electric Substation near Brandt, SD
Hwy 14 Turnlane-Construction of turnlanes on Hwy 14 just East of Huron, SD
Ash Street-Reconstruction of Ash Street in Wolsey, SD
SD Soybean Processors-Sitework/Grading for Bin & Loadout Facility Expansion
Huron Airport – Performed Wetland Grading at several locations on the Huron Airport.
Redfield Airport– Sitework/Grading for upcoming Airport runway relocation project in Redfield.

2016

Beadle County Road 15-Process In-Place & Roadway Shaping
I-90 Jones/Lyman County-Reconstruction of 8 mile stretch of I-90 near Murdo, SD
SD Hwy 63- Surface Preparation and Gravel Placement on 20 miles of SD Hwy 63
Michels Pipeline– Aggregate Material Supplier & Delivery for the Dakota Access Pipeline
US Hwy 212 Near Gettsbury–Cold Milling and Full Depth Reclamation of 12 miles of US Hwy 212
Dakota Gobblers Expansion – Sitework for Dakota Provisions in Huron, SD
Huron High School Sports Improvement– Aggregate material supplier & site pipework
Onida Substation– Sitework for new East River Electric Substation near Onida, SD
Southtown Development– Street Construction for new Development in Huron, SD
Napa Junction Rail Park Roadway– Reconstruction of 3 mile of Roadway in Yankton County
Miller Airport– Apron reconstruction at the Miller Airport
Dakota Plains Ag Facility-Grading for Railline Dakota Ag Grain Handling Facility
Yankton Substation– Sitework for new East River Electric Substation near Yankton, SD

2015

Hwy 47 thru Highmore, SD– Urban Reconstruction of SD Hwy 47 in Highmore, SD
Miller Airport– Reconstruction of Runway & Turnaround for the Miller Airport
I-90 Jones/Jackson – Detour Ramp & Crossover Construction
Spink Co Hwy 212/37 – Pipe repairs at various locations
Broadland Road– Total Reconstruction of 8 miles of Beadle County RD 15
Hand/Hyde US  Hwy 14– Cold Milling, Material Blending, & Shouldering of 30 miles of US Hwy 14
Lake County RD 23 – Process in Place of 6 miles of County Road 23 near Nunda, SD
South Dakota Wheatgrowers– Sitework & roadway realignment for SDWG in Highmore, SD
RCP & E Railroad Spur Expansion– Construction of 2 mile Railroad spur just west of Huron, SD

2014

US HWY 212- Cold Milling, Material Blending & Shouldering of US Hwy 212 west of Watertown, SD
Spink Co Hwy 281-Cold Milling & Reconstruction of a section of US Hwy 281 near Redfield, SD
Arlington Street Project– Reconstruction of 8 city blocks of Streets in Arlington, SD
Fertilizer Bldg Expansion of Wilber Ellis-Site work for Wilber Ellis Fertilizer expansion in Miller
HWY 25 & Hwy 28 – Mainline Pipe replacements at various locations on SD Hwy 28 & 25
Watertown 3rd Ave NW– Urban reconstruction of 1 mile 3rd Ave NW in Watertown, SD
South Dakota Wheatgrowers– Sitework for new Agronomy Center in Tulare, SD
South Dakota Wheatgrowers– Sitework for new Agronomy Center in Mellette, SD